Day 20 highlights:
Foundation hole was dug.
Yard was destroyed.
Day 21 highlights:
Foundation footer framing was assembled.
It was also inspected and passed.
The family room floor was leveled to meet the kitchen floor so the hardwood can go down
Yard was mucked up some more. ;o(
Day 22 highlights:
Under cabinet lighting was installed in my room
Cement truck came and poured the footers for the addition
I trashed my room by bringing a bunch of crap into it
I also made extra shelves for my cupboards.....I even ripped them MYSELF!!! I'm am the woman........lmao!
I don't think I showed you the finished cabinet doors.........they came out pretty good......If I had to do it again (which I hope I NEVER have to....lol), I'd leave a pattern's width of fabric in the middle of the two doors so the ribbon could line up better....my mistake....
And this was one of those CM magnetic thingy's - I took the white fabric off and covered it with the gingham left from my chair.......
Friday, June 6, 2008
Days 20, 21 & 22......
Posted by Amanda D. at 6:52 PM
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment